Contact sent successfully

Something went wrong. Try again.

Gardauno Spa

Garda Uno SpA has provided its customers over the territory with two different meters. One is a direct-reading meter (numeric meter) and the other is an indirect-reading meter (clock meter).

To take meter readings follow the instructions below:

Numeric meter

Read the numbers in the squares. If there is a comma, read only the numbers on the left of the comma excluding the decimals.

The meter reading in the picture is equal to 1959 m3.

Clock Meter

Read only the digits with the arrows pointing at them inside the black clocks (only the clocks with the sign x1000, x100, x10, x1). if the arrow is set between two digits, for example between 4 and 5, take the reading of the lower number: 4.

The order of transcription goes from the clock with the x1000 sign to the one with the x1 sign.

The meter reading in the picture is equal to 228 m3.

 

 


 

Italian to english translation by Maria Begliutti - Liceo Scientifico Statale Enrico Fermi , Salò (BS) - for the Garda Uno Lab project

caricamento...